How Long Does it Take to Build a Pool in Los Angeles?

Written By: Paul Dashevsky
Last updated Jul 27, 2026
Written By: Paul Dashevsky
Last updated Jul 27, 2026
how long to build a pool in los angeles

Building a pool in Los Angeles typically takes 2 to 4 months from start to finish, and longer counting design and permitting, which can add several weeks to a few months. Weather, inspections, and custom features affect the timeline. Here’s how long it takes to build a pool in LA.

Pools are popular mainstays in Los Angeles backyards. They’re a significant investment, but they can also bring years of enjoyment and increase your home’s value. But how long does it take to build a pool in Los Angeles? The short answer is: it depends. There are many stages of construction, and that’s not taking into account external factors that can cause delays. Learning about the pool construction timeline can help you be ready for what to expect.

Here at GreatBuildz, a free service that connects homeowners in Los Angeles, Orange and Ventura Counties with reliable pool and backyard contractors, we speak to homeowners every day about their backyard and pool projects. Read on to learn how long it takes to build a pool in Los Angeles.

Stages of Construction

build a pool in LA

Building a swimming pool in Los Angeles requires careful planning and diligent work. It all begins in the design, and then applying for permits. Once approved, the area must be prepared for construction before building the pool, followed by adding things around it, such as landscaping, fencing and decking.

Design

Designing a pool typically takes one to three weeks, giving you time to collaborate with an experienced specialist and refine your vision. A professional pool designer will assess the land and help design the overall look, based on size, depth, flow and style. They’ll provide representations of the design for feedback and finalization. The process begins with multiple drafts that includes more than just the pool itself; it’s just the centerpiece of your fuller outdoor area design.

Permits

You’ll certainly need to obtain permits before you can start creating your dream pool, which can be frustrating. The local government in Los Angeles requires building permits for pool construction, and contractors must comply with state regulations. Unfortunately, the timeline for permit approval is out of your hands and varies depending on the municipality. You may be waiting anywhere from two weeks to two months to receive the permits. Once approved, however, you can begin building your custom pool.

Preparing the Area

Once you have the permits, the company will prepare your yard for pool construction. This requires excavation and groundwork to clear any obstacles or accessories from the designated area. Other than the excavation, there’s also the matter of plumbing and electricity. The plumbing setup includes proper drainage for safety, and electrical fixtures are installed according to plan. These final preparations for the pool typically take three to six weeks.

Building the Pool

build a pool in los angeles

Now starts the thrilling process of constructing the pool! The timeline here depends on the material used, as a concrete pool takes longer than ones with a vinyl lining. Generally, this process takes three to six weeks. After the floor and walls of the pool are in, creative elements (like tile and coping) and decorative lining (such as marble or brick) can be added.

Adding the Final Touches

Once the pool is done, it’s time to focus on what’s around it. The timeline depends on what options you choose, but the final touches typically take another one to three weeks.

Pool decking is typically first up, and can be made from materials ranging from concrete to stone to tile. Talk with a contractor about what materials will work best for your needs. You may also consider installing a fence around the pool to keep kids and pets safe, in some states like California, it’s law, along with other safety features. 

Don’t forget about landscaping! Plant shrubs or trees nearby for shade in summer months, add flowers and other plants for color, and add outdoor furniture so you can enjoy your new backyard oasis whenever you please.

 

Things That Impact Time to Build a Pool in Los Angeles

The type and size of pool, the added amenities that you choose to include, and unforeseen things are all factors that can impact the amount of time it takes to build a pool.

Type & Size of Pool

The more complex the design or larger size of your pool, the longer it may take to construct. Pre-fabricated and vinyl liner pools are among the quickest options, while concrete pools require more time for excavation and construction. Similarly, in-ground pools will usually take longer to install than above-ground ones.

Extra Pool Amenities

Extra touches, such as water features, fire bowls, and sunken firepits, can turn your outdoor oasis into the ultimate spot for relaxation, as long as you’re willing to be patient. Installing these features typically takes longer than standard pool construction, but the results may be worth it. 

Unpredictable Delays

As with any construction project, unforeseen events could crop up during building which could cause delays. Weather is a major factor, with storms able to slow any outdoor project. In addition, supply delays can be common and can cause significant hold-ups if not properly managed. Make sure to have backup plans in case any unexpected issues arise during the construction process.

Choosing the Right Pool Contractor

build a pool in los angeles timeline

Constructing a pool is complex, making it all the more important to pick a trustworthy contractor. Here are some things to keep in mind when narrowing down your list of options:

  • Licensing: Make sure you always hire a licensed contractor with the proper certifications. What those entail can vary by area, but meeting the criteria is a good indication of quality.
  • Transparency: When you ask the contractors questions, do they give you specific answers? Is their proposal detailed? The more open a contractor is about your pool project, the better.
  • Reviews: Look for companies that have a history of high ratings. You can also talk with previous clients for more information.
  • Experience: Companies that have been around longer are typically more reliable.
  • Insurance: The complexity of pool construction might lead to a mistake, but having a company with insurance can alleviate concerns.

Most importantly, be sure to ask the contractor any questions you have. You want to choose someone you feel can be trusted with such a big project for your home.

Are You Ready For a Pool?

The construction time to build a pool in Los Angeles ranges from four to six months, depending on the desired complexity and size. It’s also tricky to give a hard timeline, as uncontrollable factors such as weather and the availability of materials can have a big impact on how long the process takes. But with the help of qualified professionals, your pool project can be completed smoothly and successfully.

Frequently Asked Questions

How long does it take to build a pool in Los Angeles?

Construction typically takes 2 to 4 months once work begins, covering excavation, steel, plumbing, gunite, tile, decking, and plaster, each with inspections. Design and permitting beforehand can add several weeks to a few months. Custom features, weather, and inspection scheduling affect the total timeline.

What is the process of building a pool?

The main phases are design and permitting, excavation, steel and plumbing, the gunite or shotcrete shell, tile and coping, decking, equipment installation, plaster, and startup. Each phase includes inspections. The sequence and inspections are why even a straightforward pool takes a few months to build.

Do I need a permit to build a pool in Los Angeles?

Yes. Pools require building permits and must meet code, including barrier and safety-fence requirements. Your pool contractor typically handles the permits and inspections. Permitted construction protects your safety and your home’s value, so never let a contractor skip this step.

Why not let GreatBuildz match you with great pool and outdoor contractors? We work with a network of qualified, pre-vetted contractors experienced in Los Angeles.

 

Simply reach out, let us know what your needs are, and we’ll connect you with the perfect contractor for your project who you know you’ll be able to rely on.

 

For more information, contact us today at (818.317.3567) or visit our website.

 

<a href="https://www.greatbuildz.com/author/paul/" target="_self">Paul Dashevsky</a>

Paul Dashevsky

Paul Dashevsky is the co-founder of GreatBuildz and Co-CEO of Maxable Space, with over 25 years of experience in real estate development, construction, and investment. Since he co-founded GreatBuildz in 2019, the company has evaluated 20,000+ California contractors and helped 2,000+ homeowners. He has personally built and renovated 350+ homes and has been featured in Forbes, the Los Angeles Times, and US News & World Report. Paul helps homeowners navigate home renovations and ADU projects with trusted professionals.

How can we help with your project?

Explore More Remodeling Topics

Remodeling Cost Guides

Cost Guides

design ideas

Design Ideas

Finding a Contractor

Finding a Contractor

Picking Materials

Selecting Materials

remodeling advice

Remodeling Advice

room addition project articles

Home Additions

kitchen Remodeling Guidance

Kitchen Remodeling

 

bathroom remodeling advice

Bathroom Renovations

adu and garage conversion blog topics

ADU Construction

backyard Remodeling Projects

Backyard/ Exterior

general home remodeling resources

Home Remodeling