How Long Does It Take to Remodel a Kitchen?

Many homeowners envision a contemporary, rejuvenated kitchen as the pinnacle of home improvements. However, realizing this vision requires more than enthusiasm — it demands careful planning and execution.

From choosing suitable tiles to waiting for that custom cabinet set, every choice and its availability significantly influence the renovation timeline. For instance, replacing a countertop goes much faster than overhauling the entire kitchen layout. Moreover, timely material procurement streamlines the process. Here’s the average time it takes to remodel a kitchen, plus factors that affect that plan.

Here at GreatBuildz, a free service that connects homeowners in Los Angeles, Orange, and Ventura Counties with reliable kitchen contractors, we speak to homeowners every day about how long it takes to remodel a kitchen – read on to learn more.

The Reality Behind TV Show Renovations

Most people know those home remodeling programs where transformations happen in the blink of an eye. While these programs provide entertainment and inspiration, they often gloss over the meticulous planning, groundwork, and considerable time actual renovations demand.

Many homeowners who are eager to see their renovated spaces, often express, “I thought it would be done by now.” You’re in good company if you share the same feeling. It frequently stems from:

  1. Designers or contractors setting optimistic timelines.
  2. Homeowners envisioning swift completions.
  3. Adjustments made during the renovation naturally extend the project’s timeline.

Happy couple opening oven in kitchen

Breaking Down the Kitchen Remodeling Timeline

Kitchen remodeling timelines vary based on your project’s scope and intricacy. When you update existing components while keeping the same layout, you opt in for a “replacement kitchen.” This approach offers a direct path to renovation, free from the challenges of extensive construction or custom modifications. A moderate-sized kitchen typically undergoes this transformation in as little as four months.

On the other hand, if you aim to craft a unique space tailored to your preferences, the timeline extends. This approach goes beyond mere replacements — it reshapes the entire space. Whether introducing new walls or redefining the floor plan, these custom kitchen renovations require more time. You can anticipate such detailed projects to conclude in about 6 months.

contractor checking if they are on schedule

A General Timeline To Remodel Your Kitchen

A kitchen remodel sparks excitement and anticipation. While meticulous planning sets the stage, the collaboration of specialty subcontractors and the integration of specific products enhance the project’s rhythm. This coordination ensures the project progresses smoothly.

Moreover, a proactive project management strategy effectively addresses and reduces potential delays. To provide a detailed perspective, here’s a breakdown of a standard custom kitchen renovation timeline:

  • Week 1: Initial preparations kick off the project, leading to the removal of outdated elements. The framing then adjusts to accommodate the new design.
  • Week 2: Subcontractors actively lay the foundational systems, incorporating plumbing, electrical setups, and ductwork.
  • Week 3: Inspections take place to validate the quality of installations. After successful inspections, the team installs insulation and stocks up drywall materials.
  • Week 4: The team installs the drywall, shaping the room’s walls. A fresh coat of primer then prepares them for painting.
  • Week 5: The room’s aesthetic appeal starts to unfold. The team lays down the flooring and installs the cabinets, forming the kitchen’s core.
  • Week 6: The team focuses on precision, measuring spaces for countertops. Alongside this process, they enhance the room’s charm with interior trim work.
  • Week 7: The kitchen begins to resonate with functionality. The team positions the countertops and integrates the appliances.
  • Weeks 8 and 9: The space transforms with vibrant colors. The team paints the walls and finalizes the flooring.
  • Week 10: As the transformation concludes, a professional team cleans the kitchen, making it ready for use. A thorough walkthrough confirms the alignment of every detail with the homeowner’s aspirations.

contractor checking blueprints and plans

Cost of a Kitchen Remodel

On average, a kitchen remodel costs between $30,000 and $100,000, depending on the finish and design you want to achieve. Hence, understanding each component’s price can help you make confident decisions.

This clarity ensures you allocate your budget effectively, balancing value, and aesthetic appeal. The cost of a kitchen renovation encompasses the following.

Engaging in Design Consultations

Before any hammer hits a nail, design consultations set the stage for your envisioned kitchen. These sessions — often with seasoned architects or interior designers — transform your ideas into actionable plans.

These professionals will help ensure your renovation projects add value to your home — as much as $45,000 for a large remodel — and align with your overall design vision. While these experts bring invaluable insights, they also come with their price tags.

Choosing Your Appliances

Modern kitchens shine with the latest appliances, from energy-saving refrigerators to intuitive ovens. Your choice of brand and technology can influence your budget. High-end brands or cutting-edge technologies offering superior performance might come at a premium.

Picking Fixtures and Fittings

Details matter. The faucets, sinks, handles, and light fixtures you pick add to the budget. Standard fixtures offer reliability, but if you lean towards luxury brands or bespoke designs, you’re looking at a different price range.

Selecting Your Cabinets

Cabinets serve function and form. Ready-made ones offer convenience and are typically more affordable than custom-built ones. They come in standard sizes and finishes, making them a practical choice for many homeowners.

If you opt for custom-built ones, the type of wood, finishes, and hardware can vary in cost. Custom-built cabinets allow for more flexibility but can be more expensive due to the unique craftsmanship.

Blue cabinets in a remodeled kitchen in LA

Preparing To Remodel a Kitchen

A successful kitchen remodel doesn’t start with demolition or construction — it begins with meticulous preparation. Proper groundwork minimizes disruptions and sets the stage for a successful renovation.

Decluttering and Organizing

Before any renovation starts, it’s crucial to declutter your kitchen. Remove any non-essential items, outdated food products, and rarely used utensils. Streamlining your kitchen’s contents creates a more manageable space for the remodel to commence.

Safeguarding Valuables

Protect your valuable items that remain in or near the kitchen. This includes delicate china, glassware, and electronic appliances. Consider packing them in boxes and storing them in a different room, or renting a temporary storage unit.

Setting Up a Temporary Kitchen

Since your main kitchen will be out of commission, set up a makeshift one in another part of your home. This space can have essentials like a microwave, a toaster, a small fridge, and some basic utensils. It ensures you can still prepare simple meals without significant disruptions.

Communicating with Your Contractor

Maintain open communication with your contractor. Discuss the project timeline, potential challenges, and any preparations they might need from you. This mutual understanding ensures both parties are on the same page throughout the renovation.

Securing Permits

Depending on the extent of your remodel and local regulations, you might need specific permits. Ensure you or your contractor secures these to avoid legal complications or delays.

Preparing for Dust and Noise

Renovations can be messy and noisy. Prepare yourself and your family for this temporary inconvenience. Consider investing in earplugs, setting up dust barriers or planning occasional stays away from home during the noisiest phases.

Happy kids cooking in the kitchen

Start Your Kitchen Renovation Today

A kitchen renovation demands dedication and insight. It’s not just about tearing down old cabinets or installing a new countertop — it’s about reshaping a vital part of your home to reflect your style and needs.

Effective planning is the cornerstone of a successful renovation. Equip yourself with knowledge, anticipate potential challenges, and remain steadfast. As renovation starts, your perseverance will pay off, culminating in a kitchen that elevates your home’s visual appeal and boosts its overall value.

How long does it take to remodel a kitchen?

 

If you’re planning to remodel a kitchen, you shouldn’t have to go it alone – GreatBuildz can help simplify your contractor search. GreatBuildz is a free service that connects homeowners in Los Angeles, Orange, and Ventura Counties with reliable, thoroughly screened general contractors and provides project support from start to finish.

 

Call us at 818.317.3567 to get realistic, local price estimates for your kitchen renovation or any other kind of home remodeling project.

Author:

Rose Morrison is a home & construction writer from Pittsburgh, PA. She’s the managing editor of Renovated, a web magazine for the real estate industry. She’s most interested in sharing home projects and inspiration for the most novice of DIY-ers, values she developed growing up in a family of contractors.

Hi, we're Paul and Jon - Co-Founders of GreatBuildz. We believe everyone deserves to find a great contractor, have a stress-free renovation, and enjoy their beautiful new space. There are so many contractors out there and it's often hard to tell the good from the bad... until it's too late. We started our company to help simplify your contractor search and help you have a stress-free renovation experience. We're always available to help, no matter where you are in the process. Click here to learn more about our story.